Lydakis crews working in the brick shell of the new emergency department at Agios Georgios, the General Hospital of Chania
Infrastructure · Healthcare · Chania

Agios Georgios Hospital, Chania

The second emergency department of the island's A&E programme: renovation, extension and redesign at the General Hospital of Chania, photographed in June at the stage where a hospital is still brick, dust and chalk lines.

General Hospital of ChaniaShell and first fixWorks in progress
Project
Emergency Department (A&E)
Facility
Agios Georgios, General Hospital of Chania
Scope
Renovation, extension and redesign
Delivery
Design and construction
Stage photographed
Shell and first fix, June 2026
Status
Works in progress
Category
Infrastructure

Two cities, one standard of emergency care

The A&E programme runs on both sides of the island at once: PAGNI in Heraklion, and Agios Georgios in Chania here. The Chania works are younger, which is exactly why these photographs matter. This is what every finished hospital floor looks like first: brick shell, chalk lines, drawings taped to the wall, and crews who have done this before.

ΤΕΠ Γενικού Νοσοκομείου Χανίων «Άγιος Γεώργιος»

The site log, June

Four entries from one month on site, in the order every hospital floor is actually built.

01

Setting out

Before anything rises, the department is drawn on the floor: instrument lines, chalk and string turning the architects' plan into positions a crew can build to.

Two Lydakis engineers setting out with the survey instrument inside the shell
Three figures setting out positions across the hall, in black and white
02

Masonry

The new rooms arrive block by block, carried by hand to the lines laid out the week before. Walls first, openings held by lintels, every course checked.

Worker carrying blocks to a rising partition wall
Up the ladder working beneath a fresh lintel
03

Structure

Where the old building meets the new scope, steel and grinder work: existing members cut back, strengthened and made ready to carry a department that never sleeps.

Grinding sparks at a column base during structural works
Steel sections laid out in the hall, waiting to go in
04

First fix

The ceilings begin to fill: conduit runs, brackets and the first kilometres of the services a modern emergency department carries above every corridor.

Crews in orange vests working through the warm brick hall
Conduit runs across the ceiling, in black and white
Cutting at the doorway, daylight pouring through the opening
Two crews on ladders setting out services in the brick shell
Two heads bent over the construction drawings, in black and white
Construction drawings taped to the wall, a hand following the plan
A Lydakis site vest from behind, yellow hard hat on
Daylight through the brick openings striping the unfinished floor
The Lydakis sign on the site hoarding outside the General Hospital of Chania

June on site, twice

Both reels from the month. Tap for sound.

Let's build it: from the first drawing to the keys

+30 2810 225586
Thank you — your request is in the Lydakis inbox. We will call you back within one working day.
In a hurry? Call +30 2810 225586 or write to info@lydakis.com.
Your email app just opened with the details filled in — press send and we will call you back within one working day.
Nothing opened? Email us at info@lydakis.com or call +30 2810 225586.
Looking to buy instead of build?Explore Lydakis Estate →